Cascade House

A private residence located along the shore of Lake Washington, Cascade House hopes to achieve net-zero energy consumption.

read more

UW Tacoma – Milgard Hall

Award-winning UW Tacoma Milgard Hall is now complete with 55,000 SF of classroom and lab space. 4EA provided construction and design consultation.

read more

Transbay Block 2 West

Transbay Block 2 is a keystone parcel located in the Transbay District. The project is divided between two buildings, the East and West. The two buildings are separated by a through-block mews with open space.

read more

Transbay Block 2 East

Transbay Block 2 is a keystone parcel located in the Transbay District. The project is divided between two buildings, the East and West. The two buildings are separated by a through-block mews with open space.

read more

The Bush School

4EA provided building envelope consulting services and PHIUS+ certification for the Bush School related to environmental separation and energy performance.

read more

Hamlin Robinson School

Hamlin Robinson School (HRS) is Washington’s only non-profit school dedicated to dyslexia and language-based learning differences. 4EA consulted with the

read more

1101 2nd Avenue

4EA considers 1101 2nd Avenue a successful large-scale renovation. With the integrity of an iconic Seattle building maintained while making energy conscious improvements. 

read more

Day 1

Day 1 is a 37-story structure that provides more than one million square feet of office space for its thousands

read more

Block 18

Block 18 is a 17-story high-rise commercial building on a half block of the Denny Triangle neighborhood. Its unique glass

read more