4EA in the News: August 2026
August 31, 2026
The following includes articles discussing projects that 4EA is consulting on as the enclosure consultant. Our projects include mid-rise apartments, educational facilities, cultural and civic centers, private residences, and commercial enclosures. Find more projects here!
PNB starts construction on new SoDo school
August 3, 2026, DJC
“The DJC reported in October that Pacific Northwest Ballet (PNB) was taking space at the Track Six building at 3847 First Ave. S. in SoDo for a new school. Construction began on that tenant improvement project last week.
The school is leasing 23,500 square feet on the third level of the industrial building to be home to the new Peter Boal Center, named for PNB’s artistic director.
The school will be for lower-level and open class students. It will have a reception area, six dance studios, dressing and locker rooms for all ages and genders (with separate spaces for children, adult students and faculty), administration areas including offices, an open work area and a meeting area, a family waiting area, a kitchen, and a study area for students to work between classes.”
Trailhead TOD breaks ground in Issaquah
August 5, 2026, DJC
“Issaquah’s long-awaited 154-home TOD effort, Trailhead Apartments, finally celebrated its groundbreaking last week at 1550 Newport Way N.W.
The city of Issaquah has been working for many years with the King County Housing Authority (KCHA) to redevelop the commercial property as a mixed-use development with affordable housing and community service providers.”
Graham Baba Architects designs new facility for longtime Vashon Island food bank
August 12, 2026, DJC
“The Vashon Maury Community Food Bank, which has been serving Vashon Island since the 1970s, snipped the ribbon on its first purpose-built facility in March.
Designed by Seattle’s Graham Baba Architects, the social services hub is located at 17928 Vashon Hwy. S.W. in the heart of downtown. Before, and since 1993, the food bank had been located out of town in a series of structures originally built as part of a former Nike missile base.
Construction of the new food bank began in July 2025. It was built by Colvos Construction.”
Concord Pacific announces fall opening, new general manager, for Seattle House
August 12, 2026, DJC
“Developer Concord Pacific US says it will open Seattle House this fall. Above-ground construction for the luxury apartment building started at 2300 Sixth Ave. in the heart of Denny Triangle in late 2023.
Arcadis designed the distinctive property. It features twin 45-story residential towers rising above a multi-level mixed-use podium. Seattle House will have a total of 1,131 apartment homes plus more than 50,000 square feet of dedicated amenity spaces including areas to work, gather and play. Notable amenities include a spa-inspired wellness suite and a pool on the 13th floor.
The podium level includes 13,897 square feet of retail space. Residents will park in a subterranean parking garage with eight levels.”
Work begins on 70 units near U Village
August 19, 2026, DJC
“Apartment plans began brewing seven years back for that sloping, crescent-shaped site, just south of the Burke-Gilman Trail and east of Five Corners, near Laurelhurst. You could also place it on the south periphery of the Bryant neighborhood.
Shilshole Development and Public47 Architects secured their MUP three years ago for a six-story, 70-unit building dubbed Trestle. And this month Stringham Construction began the groundwork and foundations. The permit for shoring and grading was issued a few weeks ago. Project ownership seems to have passed to Eastlake Real Estate Partners, which has some overlap with Shilshole.”
North Shore moves forward on school builds with flurry of awards
August 20, 2026, DJC
“The North Shore School District has been busy this summer, picking builders for several elementary and middle school projects and shortlisting two GC/CM contenders for upgrades at Kenmore’s Inglemoor High.
Most recently, the district reported on Aug. 12 that it had awarded a $59 million design-build contract for Kokanee Elementary School to the team of NAC Architecture and Abbott Construction. That 40,000-square-foot expansion of the existing school at 23710 57th Ave. S.E. in Woodinville includes new classrooms, a new cafeteria, and possibly a new main office, as well as playfields and site upgrades, the DJC previously reported.“
Samma starts welcoming seniors in Bothell
August 25, 2026, DJC
“Developer Imagine Housing has opened the Samma Senior Apartments at 17910 Bothell Way N.E. in Bothell.
The community has 76 affordable apartment homes for seniors aged 55 and over who are at or below 50% of the area median income.
Construction began in 2022. The building opened this month.
Synergy was the general contractor. Third Place Design Co-operative was the architect.”
Ballard Food Bank expands into neighboring space, with renovations planned
August 25, 2026, DJC
“Ballard Food Bank purchased a new 4,820-square-foot building one block west of its Leary Way home last month, and plans improvements for both spaces.
The 501(c)(3) nonprofit organization said its nearly five-year-old Leary Way hub is operating at almost double its intended capacity, and the new building will help it meet significant increased need for its services.”
TCO arrives for 24 Capitol Hill units, with leasing effort to follow?
August 26, 2026, DJC
“Builder BMDC began work two summers ago at 1410 E. Howell St. on Capitol Hill. There, BIG Management had earlier purchased a small old 11-unit building on the corner of 14th Avenue. It was later demolished, and Public47 Architects secured the MUP for a five-story, 24-unit replacement.
The city issued a temporary certificate of occupancy this week for a still unnamed project that surprisingly lacks a leasing website.”
Roots to Roofs sprouts Thunderbird Nest in Licton Springs
August 26, 2026, DJC
“Thunderbird Nest, a forthcoming affordable housing development in Seattle’s Licton Springs neighborhood, is in permitting, and design is well underway.
The development is an early adopter of the city’s Roots to Roofs program, a pilot program passed unanimously by the Seattle City Council last June. It provides density and additional height bonuses citywide to community-led organizations developing housing in areas that historically had racially restrictive covenants, such as Licton Springs.”
Near East Main Station, 279 Bellevue units gain steam
August 31, 2026, DJC
“Twelve months ago, the DJC first reported on Trammell Crow Residential’s plan to put a new apartment building on a Bellevue office parking lot near East Main Station. The proposal for the 9-acre Gateway One property, at 11400 S.E. Eighth St., gained steam this past May. Recent permit filings add fresh detail.
Clark Barnes is designing the eight-story, 279-unit project. It’s to rise west of the 40-year-old office building owned by Felton Properties of Portland. (There will evidently be a lot boundary adjustment and future land sale.) The new apartments would mostly front on 112th, parallel to the light-rail tracks. The station is about a 10-minute walk north. The building’s L-shaped footprint would be inset within the corner of 112th and Eighth, leaving much surface parking intact.”
Follow us @team4ea!




